{"product_id":"beny-kuormanhallintayksikon-langaton-tiedonsiirtolaite","title":"BENY load management unit wireless communication device – no WiFi, no communication cable","description":"\u003cp\u003eBENY’s wireless data transmission device enables connecting an EV charging station to a load management unit without a data cable or WiFi network. The system consists of two separate units that communicate with each other wirelessly — one is placed in conjunction with the charging station, and the other with the load management unit. This is a practical solution for locations where cabling is difficult to install or WiFi connectivity is unreliable.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eRequired for use with BENY’s load management unit. Both units have their own power supply requirement. Data transmission: wireless (no WiFi, no Bluetooth). Installation by an electrician.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cdiv class=\"product-notice product-notice--warning\"\u003e\n\n\u003cp\u003e\u003cstrong\u003e⚠ Made-to-order product\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003eDelivery time approximately \u003cstrong\u003e1 week\u003c\/strong\u003e from order. Availability can be checked in the shopping cart.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch3\u003eTechnical specifications\u003c\/h3\u003e\n\u003cul\u003e\n\n\u003cli\u003eProduct type: wireless data transmission device for load management unit\u003c\/li\u003e\n\n\u003cli\u003eBrand: BENY\u003c\/li\u003e\n\n\u003cli\u003eCompatible system: BENY load management unit (e.g., for BCP series charging stations)\u003c\/li\u003e\n\n\u003cli\u003eNumber of units: 2 (charging station side + load management unit side)\u003c\/li\u003e\n\n\u003cli\u003eConnection inside the unit: network cable (RJ45)\u003c\/li\u003e\n\n\u003cli\u003eConnection between units: wireless (no WiFi, no Bluetooth)\u003c\/li\u003e\n\n\u003cli\u003ePower supply: required for both units\u003c\/li\u003e\n\n\u003cli\u003eProduct code: BCP-DLB-IW\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cdetails\u003e\n\u003csummary\u003e\u003cstrong\u003eCompatibility and installation\u003c\/strong\u003e\u003c\/summary\u003e\n\u003cp\u003e\u003cstrong\u003eSystem structure\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003eThe data transmission device consists of two separate units that establish a wireless data connection between the charging station and the load management unit:\u003c\/p\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCharging station end:\u003c\/strong\u003e the first unit is placed in conjunction with the charging station and connected to it via a network cable (RJ45).\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eLoad management unit end:\u003c\/strong\u003e the second unit is placed in conjunction with the load management unit, requires its own power supply, and is connected to it via a network cable.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003cp\u003eThe units communicate with each other wirelessly — no need for a WiFi network or a separate data cable between the charging station and the load management unit.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eWhen to choose the wireless option?\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eLong distance:\u003c\/strong\u003e the charging station and load management unit are far apart, and running a cable would be laborious (e.g., in a different building, behind several walls)\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDifficult cable route:\u003c\/strong\u003e concrete walls, old structures, or behind a facade\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eUnreliable WiFi connection:\u003c\/strong\u003e the wireless transmission device is designed solely for this purpose, resulting in less interference than a general WiFi network\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eBENY system package\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003eThis device requires a BENY load management unit and a BENY charging station to function. Compatible BENY products:\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eBENY BCP series charging stations (e.g., 22 kW)\u003c\/li\u003e\n\n\u003cli\u003eBENY load management unit (sold separately)\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eCheck compatibility with your system from customer service or BENY’s technical documentation before purchasing.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePower supply\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003eBoth units require their own power supply. An electrician will take care of the wiring during installation. Usually, the units are connected to a nearby electrical distribution board or the charging station's own power supply.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eInstallation by an electrician\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003eThe installation of the data transmission device is part of the total connection of the charging system and may only be performed by a professional electrician. Installation includes:\u003c\/p\u003e\n\n\u003col\u003e\n\n\u003cli\u003ePhysical placement of the units (protection from weather, reasonable distance for radio signal)\u003c\/li\u003e\n\n\u003cli\u003eNetwork cable (RJ45) connections to the charging station and load management unit\u003c\/li\u003e\n\n\u003cli\u003ePower supply connections for both units\u003c\/li\u003e\n\n\u003cli\u003ePairing \/ testing of the units\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003c\/details\u003e","brand":"BENY","offers":[{"title":"Default Title","offer_id":57474113438040,"sku":"BCP-DLB-IW","price":150.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0577\/2171\/6917\/files\/Langaton_lahetin_2.jpg?v=1780928772","url":"https:\/\/lomenled.com\/en\/products\/beny-kuormanhallintayksikon-langaton-tiedonsiirtolaite","provider":"Lumenled Oy","version":"1.0","type":"link"}